Specialized shop-warehouse for wholesale and retail trade with industrial goods "Praktis" and adjacent facility

Project details

Contractor: MEGADOM OOD
Location: Plovdiv
Period: 2020 - 2021

Technical indicators: 

  • Plot area: 11 368 sq.m.
  • Total Build-up area: 7626 sq.m. 
  • Build-up area: 7139 sq.m.
  • Vertical planning: 3620 sq.m. 
  • Landscaping: 1134 sq.m.

The project covers the construction of two main structures, a warehouse - retail part with an adjacent cash area, and an integrated administrative part on the second level - with a self-service restaurant and an office and utility part, as well as a separate block housing the covered car park with direct access to the specialised store - warehouse. 
During the period of the project, the following specialised activities are performed:
Architecture
The facade of the warehouse and administrative part is made with MW facade panels for horizontal installation with insulation. The suspended glass facade is of the Belgian Reynaers CW50F profile system and the windows on the facade are Reynaers ES50. Double-leaf automatic doors are installed on the facade of the warehouse-commercial part. The roof is constructed with a layered installation of trapezoidal profile sheet, rigid mineral wool and PVC membrane. Flaps have been installed to provide better lighting and smoke extraction. The floor in the warehouse-commercial part is made with a foot industrial polished concrete flooring.
The internal finishing works include masonry work, Knauf plasterboard walls, suspended ceiling, vinyl flooring on self-leveling screed, granite tiles, tiling of tiles.
Structure
The building is made with prefabricated reinforced concrete elements. The reinforced concrete columns are founded on single assembly cup-shaped reinforced concrete foundations. The reinforced concrete roof structure consists of main and secondary beams. The portion of the building along the south elevation intended for office and retail space and the cafeteria is constructed in a traditional monolithic technology.
Electrical
Electrical installations and equipment have been completed, the main power supply is redundant from AJ-ELLA 55 diesel generator with ATS panel for automatic switching of networks, and the second power supply is from UPS; lighting installation with Ultralux LED Industrial lamp and Led power series LP-L5 LED luminaires; lightning protection and earthing; access control and video surveillance systems have been installed.
WSS
All the site networks and internal water supply system included in the project have been completed. The Geberit Pluvia vacuum drainage system was installed for the roof drainage of the high-rise building. Valrom PVC pipes were used for the domestic sewerage.
HVAC
The following types of installations are performed - heating, air conditioning, ventilation.
Vertical Planning
Pavement have been installed on the south and north parking lots and crushed stone has been placed on the garden center side.
Landscape
Activities related to grassing of outdoor areas and planting of new plants were carried out.
Fire Alarm
The entire building is provided with a fire alarm system DETECTOMAT FCP 3004 plus and is equipped with fire hydrants according to the regulatory requirements. 
The commissioned site has been successfully commissioned.

 