Project details
Technical indicators:
- Plot area: 6216 sq.m.
- Build-up area and total Build-up area : 2450 sq.m.
The completed project is warehouse-trading building, which consists of:
- commercial and warehouse part with loading and unloading area
- domestic, sanitary and office premises
- sample room
- adjacent parking and transport connections
Completed works:
Construction and installation works:
- Excavation, site preparation and construction of temporary settlement
- Installation of prefabricated reinforced concrete structure/foundation cups, columns, main beams, capitals and plinth panels/
- Installation of metal structure /horizontal connections, roof lighting structure, facade fencing, metal canopies/
- Erection of facade with HIPERTEC WALL horizontal panels with ROCKWOOL insulation and installation of architectural details /assemblies/
- Execution of a roof type layered installation /roofing sheet 0,74/100mm, hard mineral wool, heat and waterproofing/
- Installation of Hörmann industrial sectional doors
- Ensuring better lighting and smoke extraction by installing light domes on the roof - F100W
Engineering infrastructure and installations:
- Plumbing - water supply, sewerage, fire alarm and hydrant system
- Heating, Ventilation and Air Conditioning (HVAC)
Finishing and exterior works:
- Finishing works on walls and ceilings - plastering, painting, installation of ceiling systems
- Construction of asphalt parking, sidewalks, signage and vertical planning
The site was successfully commissioned in April 2025.